The City of Clinton decided to go with the IA-DOT Rural Seed Mixture for this project and use a double net straw blanket as the mulch cover. The contractor decided to use the 16’ wide “highway rolls” for this project because of the long, open area that was to be done, as well as the increased productivity and shorter installation time that the bigger rolls provide.  Our  ECB roll-out attachment was utilized to help with the installation of the 16’ x 450’ rolls of straw blanket. The roll-out device can be used with a tractor or a skid loader and can be configured on sight to handle 8’ and 16’ wide rolls.

Project Images:
Videos Not Utube:

 

Contact Us
1000 characters left

Did You Know?

This was another IA-DOT job that consisted of constructing a new clover-leaf intersection onto I-74. The medians were seeded with the IA-DOT Rural seed mix and the slopes were matted with single net straw blanket, while the ditches were covered using double net excelsior blankets. Other products that were used included our IA-DOT silt fence, scour protection and PP5-Xtreme, which is our Type 4 Turf Reinforcement Mat for the IA-DOT.
  • DSCN0748
Our Address:12100 210th Street
Davenport, IA, USA 20806

Hours of Operation:
Mon. to Fri. 7:30am to 5pm

1800 Dixon, Suite C
Des Moines, IA, USA 50316